Total
investment
will
exceed
$800m.
Located
about
40
miles
(64.3km)
southwest
of
Wichita,
Flat
Ridge
2
will
be
the
largest
wind
farm
in
the
state
of
Kansas.
BP
Wind
Energy
and
Sempra
are
equal
partners
for
419
MW
of
the
wind
farm,
and
are
finalizing
joint
venture
agreements
for
the
additional
capacity.
BP
will
be
the
operator.
Flat
Ridge
2
will
utilize
294
General
Electric
1.6MW
turbines.
Long-term
power
purchase
agreements
have
been
signed
with
Associated
Electric
Cooperative
for
310.4MW,
Southwestern
Electric
Power
for
108.8MW
and
Arkansas
Electric
Cooperative
for
51.2MW.
When
Log in to read complete article.