The
project
is
the
first
phase
of
the
Ckani
wind
farm
in
the
Antofagasta
region
of
northern
Chile.
The
agreement
was
signed
in
Dublin
during
the
Ireland-China
Trade
and
Investment
Forum,
which
was
attended
by
Chinese
vice-president
Xi
Jinping.
Goldwind’s
US
subsidiary
will
supply
47
GW87
1.5
MW
wind
turbines
for
the
project,
with
construction
set
to
begin
by
the
end
of
2012.
Mainstream
plans
to
have
all
240MW
at
the
Ckani
wind
farm
operational
by
2015.
This
is
the
third
collaboration
between
Mainstream
and
Goldwind,
and
their
second
deal
in
Chile.
In…