Siemens win at 205MW US project

Das Foto zeigt die neue SWT-3.0-101 DD Windturbine. Eine Leistung von 3 Megawatt (MW) und einen Rotordurchmesser von 101 Metern zeichnen den neuen Prototyp der neu entwickelten getriebelosen Windenergieanlage aus. The picture shows the new SWT-3.0-101 DD wind turbine. The new prototype is a gearless machine with a power rating of three megawatts (MW) and has s rotor diameter of 101 meters.
Siemens has won a supply deal to equip a 205MW wind farm in the US.

The Germany-based manufacturer will deliver turbines from its 3MW D3 platform to the  Bison 4 development at the Bison Wind Energy Center near New Salem, North Dakota.

The order came from Minnesota Power, which is increasing the capacity of the Bison complex to almost 500MW via the extension.

Installation is due to begin mid this year with commercial operation scheduled for December 2014.The contract includes a three-year service deal.

Siemens turbines are in operation at the other Bison stages.

The blades will be made at Siemens’ factory in Fort Madison, Iowa. Nacelle assembly will be done in Log in to read complete article.

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine