Siemens makes Peru wind debut

Das Foto zeigt die neue SWT-3.0-101 DD Windturbine. Eine Leistung von 3 Megawatt (MW) und einen Rotordurchmesser von 101 Metern zeichnen den neuen Prototyp der neu entwickelten getriebelosen Windenergieanlage aus. The picture shows the new SWT-3.0-101 DD wind turbine. The new prototype is a gearless machine with a power rating of three megawatts (MW) and has s rotor diameter of 101 meters.
Siemens has received its first wind power order in Peru, for 11 turbines with a total capacity of 32MW.

The order comes from Spanish wind developer Cobra Energia for the supply, delivery and commissioning of eight Siemens 3MW SWT-3.0-108 turbines and three of its 2.3MW SWT-2.3-108 machines.

All have a rotor diameter of 108 metres and will be installed at a hub height of 80 metres.

Siemens will provide service and maintenance for seven years.

"With this order from Cobra Energia we are expanding our wind power activities in South America.

"This is the first wind project for both of our companies in Peru and together we will provide clean, renewable power Log in to read complete article.

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine