The increasecame thanks to the installation of 11 Gamesa G80 wind turbines at the site in Juchitán de Zaragoza in the State ofOaxaca.

The group’s Iberdrola Engineering& Construction unit carried out the work, which also entailed an upgrade ofthe wind farm’s grid link.

Iberdrola now boasts 230MW of windoperating in Mexico –all of it using Gamesa turbines.