The deal is an “innovative approach to manage capacity, optimize routing of turbine components and drive greater volumes through a major facility to reduce costs on a per unit basis,” the two sides say.

“With cost per megawatt getting closer to a level that will make wind energy developers less reliant upon subsidies or tax credits, any additional savings that can be taken out of the supply chain is considered critical by industry insiders and observers,” they add.

As