Aneel, the national energy watchdog, has authorised 19 projects to receive their revenue, although no power is being produced due to long delays in the transmission infrastructure build-up.

Aneel says turbines at 584MW of new wind farms are ready to spin. All projects are in the wind hot spot of Rio Grande do Norte state, in the northeast.

Last year, 626MW of projects were inaugurated without grid connection.