Another 395MW in capacity were erected in 2013 at three wind park sites that still lack a grid connection, Deutsche WindGuard said in a study commissioned by the German wind energy federation BWE and engineering industry group VDMA Power Systems.

At the end of the year, eight offshore wind parks were in construction in German waters, while another one - the 108MW Riffgat farm - was already completed, but not grid-connected.