Due to the disruptions, the grid connection had to be switched off, leading to an as-yet unquantified loss of electricity output from the 400MW Bard Offshore 1 wind park.

The 400MW Global Tech 1 wind park is also temporarily linked to BorWin1 and feeds into the grid part of the electricity it produces whenever there is spare capacity no used up by Bard.

Global