Get more from Recharge - required reading for the global renewable energy industry

Suction bucket is ready to sail

Load-out of a pioneering three-legged foundation design that could slash the cost of offshore wind  power is imminent at Bladt Industries' Aalborg yard, with developer Dong Energy now expecting to lift the structure onto a waiting installation vessel tonight for transport to the Borkum Riffgrund 1 development off Germany.

Already a subscriber? Log in here