The company, instead, will invest between $1.3bn and $1.5bn each during this period in Canadian wind projects and US solar farms. It has a 2013-14 backlog in Canada of 593MW in wind projects with a qualified feed-in tariff.

The announcement, made in a conference call with analysts, came as NextEra reported a 43% decline in third quarter earnings to $407m, or $0.97