It would cost some producers as much as $41 per MWh in lost incentives.

The Bonneville Power Administration (BPA), a federal agency responsible for operating the regional grid and marketing power from 30 dams on the Columbia and Snake rivers, is finalising a mechanism called "Environmental Redispatch", which would curtail wind turbines during periods of overgeneration. Such a period occurred last June.

With