The 1.5MW turbine installed in northwest Xinjiang province was undergoing commissioning when a freak pick-up in wind speed sent the turbine to the ground.

In a statement, Ming Yang says: “The preliminary analysis of the cause of the accident is that the construction of the foundations was insufficient for coping with local conditions with sudden strong gusts of wind, and has nothing to do with the quality of the turbine itself.”

Management