The Nordex Group has won its first order for the 4MW turbine class it launched last year from developer ABO Wind for a repowering project at the Wennerstorf 2 wind farm southwest of Hamburg.

The OEM plans to conduct sound level and performance tests over the course of this year following the installation of two of its N149/4.0-4.5 machines at the site, which is characterised by wind speeds of around 6.5