Construction of the project, which will use 33 Senvion turbines, is already underway and is expected to be concluded by the third-quarter of 2017.
The wind farm which will benefit from wind speeds of up to 8.4m/s is located outside the town of Egersund, some 75km south of Stavanger.
The acquisition of the wind farm, considered to be located in one of the best-suited sites in Europe for generating wind power, will grow Luxcara’s Flaveo Infrastructure Europe fund to some 190MW.
Luxcara