"The regulatory structure for the auctions is ready and Aneel has registered enough projects to hold yearly auctions with 1000MW or more with 10-year contracts,” he says.

Pepitone suggested A-1 auctions for solar power, which means that projects have to be built and start delivering power within 12 months after the tender.

He also notes that prices have been coming down while technology has been stabilizing.