The two sides expect to finish building 28.8MW at several locations in Tochigi prefecture by March 2016.

They plan to switch on 31.2MW of solar by spring 2015 in Hitachi, Ibaraki prefecture.

And they are also developing 8MW at five sites in Gunma prefecture.

The companies started building about 4.4MW at three sites in Gunma in July, with two more sites scheduled to start construction this year.

They