The equipment will be installed in Powertec’s new polysilicon facility, which is expected to begin production in 2012.

The technology sold to Powertec includes SDR 400 reactors, which have the capability to produce more 400 tonnes of polysilicon annually, according to GT Solar.

Powertec wants to become a leading supplier of polysilicon to support the growth of the world PV industry, says chief executive Scott Kou.

“To