More than 4km of power cables were laid by the CS Sovereign, a specialist installation vessel operated by UK outfit Global Marine Systems.
Scottish engineering firm J+S supplied the specialised equipment that will allow wave and tidal developers to connect their devices to the new and existing cables at the two sites.
“This was a challenging task performed in the ever changing conditions at our wave and tidal test sites,” says EMEC operations manager Stuart Baird.
“The