The four developers which won contracts at the auction were Enerfin Sociedad de Energia, Renova Energia, EGP - Serra Azul and Bioenergy Geradora de Energia. The lowest prices at the auction were R$87.77/MWh for projects being developed by Bioenergy.

Average prices were 12% cheaper than the R$99.58/MWh average price in the August 2011. At the time, this was widely considered the lowest price for wind power in the world.