Tennet German grid pipeline 6.2GW

Lex Hartman: 'We’re talking about a lot of money'

TenneT managing board member Lex Hartman

Transmission system operator TenneT TSO says it now has a pipeline of already existing or yet-to-be-built offshore grid connections in Germany of 6.2GW, with a further 1.2GW being tendered.

Iberdrola to start 60MW Brazil wind

16 September 2014 07:25 GMT

Update: Iberdrola halts El Cabo

16 September 2014 01:04 GMT

AMSC inches ahead in Sinovel row

16 September 2014 05:03 GMT

Element wants more time at Black Fork

16 September 2014 05:47 GMT

ECN system sees 13% output boost

16 September 2014 01:34 GMT

Germany opens 5MW RE storage

16 September 2014 12:41 GMT

EY puts China top for investors

16 September 2014 08:08 GMT

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine

Recharge App


Download the Recharge Mobile App
Get the free Recharge subscriber app on your device running iOS or Android.
Read Recharge anytime and anywhere.
Recharge IOS App

Media pack 2014


Download the 2014 Media pack
Recharge is a must-read for anybody wanting to stay abreast of renewables and puts advertisers at the heart of current debate. Media pack 2014
Media Pack 2014