Brazil's Atlantic cleared for 60MW

Brazil's power regulator Aneel said the Eurus II and Renascença V wind plants – controlled by Atlantic Energias Renováveis and both 30MW – are ready to start commercial operations as soon as their respective grid connections are ready.

User

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine

Media pack 2015


Download the 2015 Media pack
Recharge is a must-read for anybody wanting to stay abreast of renewables and puts advertisers at the heart of current debate. Media pack 2015
Media Pack 2014